Renovation and extension drawings in Sydney: what you need

A renovation starts with what is already there. Here is the set of drawings that takes it from idea to build.

Start with the existing home

Renovation and extension drawings start from survey and existing plans, because the new work has to join the old. If you have no plans, they can be drawn from measurement. Sketches and existing plans are both acceptable starting points.

The drawings and documents

Council checks and BASIX

The design is checked against council controls and buildability before it is lodged. If the work is an alteration or addition of $50,000 or more, a BASIX certificate is needed. See BASIX explained and DA vs CDC drawings.

Drafting only

You do not have to use a full design service. A designer can work from your sketches or existing plans and prepare the documentation, including checks against council controls and buildability. That suits owners who already know what they want.

Getting started

Renovation and extension drawings from a Sydney building designer include working drawings, specifications and schedules, with consultant documents coordinated.

Common questions

Can a designer draw my extension from my sketches?

Yes. A designer can work from sketches or existing plans and prepare the documentation, including council and buildability checks.

What is in a construction set?

Working drawings, specifications, detail packages and fixture and finishes schedules, with engineering and consultant documents coordinated in.

Does a renovation need BASIX?

A certificate is needed for an alteration or addition costing $50,000 or more, according to the BASIX site.

General information only. Confirm required documents with your council or certifier.

Planning a glass pool fence?

Send your suburb and what you need. Your enquiry goes to Jake Roberts.

Call nowGet a Quote